Burkina Faso's estimated postharvest losses for fonio in 2008 was 4,065 tonnes or 20.8%.
In the value chain, the majority of the loss is estimated to be happening at Harvesting/field drying, Threshing and Shelling, and then Market storage. Highest estimated postharvest maize losses in tonnes were estimated to occur in Boucle du Mouhoun.
To view the list of studies used to estimate these losses, please see the References tab.
Production quantity and estimated postharvest losses
Production quantity (tonnes)
Estimated postharvest losses (tonnes)
2011–2021
2011
14499
2012
20661
2013
19888
2014
8563
2015
13091
2016
10936
2017
10069
2018
11270
2019
10238
2020
10581
Produced
19,545 tonnes
Estimated postharvest losses
20.8%
/ 4,065 tonnes
Production quantity
Estimated postharvest losses
79.2002Production quantity: 19,545 tonnes
20.8Estimated PHL: 4,065 tonnes
See full postharvest losses data table with estimated losses in
percentage ›
| tonnes ›
Value chain
Production quantity and estimated postharvest losses in % per value chain step. Please note that once loss has occurred at harvesting, the percentage loss in the next stage is a percentage of what remained, not of the original amount.
Estimated % of crop left
Estimated % of crop lost
Amount remaining(%)
Estimated postharvest loss(%)
Production
100Remaining: 100% Est. PHL: 0%
0Remaining: 100% Est. PHL: 0%
Harvesting/field drying
89.3446Remaining: 89.3446% Est. PHL: 10.6554%
10.6554Remaining: 89.3446% Est. PHL: 10.6554%
Threshing and Shelling
85.8446Remaining: 85.8446% Est. PHL: 3.5%
3.5Remaining: 85.8446% Est. PHL: 3.5%
Winnowing
83.3446Remaining: 83.3446% Est. PHL: 2.5%
2.5Remaining: 83.3446% Est. PHL: 2.5%
Transport from field
80.8446Remaining: 80.8446% Est. PHL: 2.5%
2.5Remaining: 80.8446% Est. PHL: 2.5%
Household-level storage
80.74951Remaining: 80.74951% Est. PHL: 0.09509%
0.09509Remaining: 80.74951% Est. PHL: 0.09509%
Transport to market
79.74951Remaining: 79.74951% Est. PHL: 1%
1Remaining: 79.74951% Est. PHL: 1%
Market storage
77.09951Remaining: 77.09951% Est. PHL: 2.65%
2.65Remaining: 77.09951% Est. PHL: 2.65%
See full value chain data table with estimated losses in
percentage ›
| tonnes ›