Botswana, Millet, 2019

Botswana's estimated postharvest losses for millet in 2019 was 42 tonnes or 6.6%.

In the value chain, the majority of the loss is estimated to be happening at Harvesting/field drying, Transport from field, and then Threshing and Shelling. Highest estimated postharvest maize losses in tonnes were estimated to occur in Chobe.

To view the list of studies used to estimate these losses, please see the References tab.

Production quantity and estimated postharvest losses

  • Production quantity (tonnes)
  • Estimated postharvest losses (tonnes)
2011–2021
2011 2541
2012 1991
2013 1426
2014 3701
2015 584
2016 1724
2017 1377
2018 1724
2019 635
2020 1724
Produced 635 tonnes
Estimated postharvest losses 6.6% / 42 tonnes
Production quantity Estimated postharvest losses
93.36268 Production quantity: 635 tonnes 6.6 Estimated PHL: 42 tonnes

See full postharvest losses data table with estimated losses in percentage › | tonnes ›

Value chain

Production quantity and estimated postharvest losses in % per value chain step. Please note that once loss has occurred at harvesting, the percentage loss in the next stage is a percentage of what remained, not of the original amount.

  • Estimated % of crop left
  • Estimated % of crop lost
Amount remaining(%) Estimated postharvest loss(%)
Production 100 Remaining: 100%
Est. PHL: 0%
0 Remaining: 100%
Est. PHL: 0%
Harvesting/field drying 97.15669 Remaining: 97.15669%
Est. PHL: 2.84331%
2.84331 Remaining: 97.15669%
Est. PHL: 2.84331%
Threshing and Shelling 95.15669 Remaining: 95.15669%
Est. PHL: 2%
2 Remaining: 95.15669%
Est. PHL: 2%
Winnowing 95.15669 Remaining: 95.15669%
Est. PHL: 0%
0 Remaining: 95.15669%
Est. PHL: 0%
Transport from field 92.65669 Remaining: 92.65669%
Est. PHL: 2.5%
2.5 Remaining: 92.65669%
Est. PHL: 2.5%
Household-level storage 92.22241 Remaining: 92.22241%
Est. PHL: 0.43428%
0.43428 Remaining: 92.22241%
Est. PHL: 0.43428%
Transport to market 91.22241 Remaining: 91.22241%
Est. PHL: 1%
1 Remaining: 91.22241%
Est. PHL: 1%
Market storage 89.77055 Remaining: 89.77055%
Est. PHL: 1.45186%
1.45186 Remaining: 89.77055%
Est. PHL: 1.45186%

See full value chain data table with estimated losses in percentage › | tonnes ›