Mozambique, Millet, 2021

Mozambique's estimated postharvest losses for millet in 2021 was 3,818 tonnes or 10.9%.

In the value chain, the majority of the loss is estimated to be happening at Harvesting/field drying, Transport from field, and then Winnowing. Highest estimated postharvest maize losses in tonnes were estimated to occur in Tete.

To view the list of studies used to estimate these losses, please see the References tab.

Production quantity and estimated postharvest losses

  • Production quantity (tonnes)
  • Estimated postharvest losses (tonnes)
2011–2021
2011 35017
2012 21947
2013 35017
2014 29335
2015 10916
2016 35017
2017 35017
2018 35017
2019 35017
2020 35017
Produced 35,017 tonnes
Estimated postharvest losses 10.9% / 3,818 tonnes
Production quantity Estimated postharvest losses
89.0965 Production quantity: 35,017 tonnes 10.9 Estimated PHL: 3,818 tonnes

See full postharvest losses data table with estimated losses in percentage › | tonnes ›

Value chain

Production quantity and estimated postharvest losses in % per value chain step. Please note that once loss has occurred at harvesting, the percentage loss in the next stage is a percentage of what remained, not of the original amount.

  • Estimated % of crop left
  • Estimated % of crop lost
Amount remaining(%) Estimated postharvest loss(%)
Production 100 Remaining: 100%
Est. PHL: 0%
0 Remaining: 100%
Est. PHL: 0%
Harvesting/field drying 96.50013 Remaining: 96.50013%
Est. PHL: 3.49987%
3.49987 Remaining: 96.50013%
Est. PHL: 3.49987%
Threshing and Shelling 94.50013 Remaining: 94.50013%
Est. PHL: 2%
2 Remaining: 94.50013%
Est. PHL: 2%
Winnowing 92.23868 Remaining: 92.23868%
Est. PHL: 2.26145%
2.26145 Remaining: 92.23868%
Est. PHL: 2.26145%
Transport from field 89.73868 Remaining: 89.73868%
Est. PHL: 2.5%
2.5 Remaining: 89.73868%
Est. PHL: 2.5%
Household-level storage 88.60173 Remaining: 88.60173%
Est. PHL: 1.13695%
1.13695 Remaining: 88.60173%
Est. PHL: 1.13695%
Transport to market 87.60173 Remaining: 87.60173%
Est. PHL: 1%
1 Remaining: 87.60173%
Est. PHL: 1%
Market storage 86.30173 Remaining: 86.30173%
Est. PHL: 1.3%
1.3 Remaining: 86.30173%
Est. PHL: 1.3%

See full value chain data table with estimated losses in percentage › | tonnes ›