Senegal's estimated postharvest losses for fonio in 2008 was 656 tonnes or 18.2%.
In the value chain, the majority of the loss is estimated to be happening at Harvesting/field drying, Threshing and Shelling, and then Market storage. Highest estimated postharvest maize losses in tonnes were estimated to occur in Sédhiou.
To view the list of studies used to estimate these losses, please see the References tab.
Production quantity and estimated postharvest losses
Production quantity (tonnes)
Estimated postharvest losses (tonnes)
2011–2021
2011
3609
2012
1923
2013
1598
2014
1588
2015
2360
2016
3228
2017
3757
2018
4214
2019
3921
2020
3609
Produced
3,609 tonnes
Estimated postharvest losses
18.2%
/ 656 tonnes
Production quantity
Estimated postharvest losses
81.8152Production quantity: 3,609 tonnes
18.2Estimated PHL: 656 tonnes
See full postharvest losses data table with estimated losses in
percentage ›
| tonnes ›
Value chain
Production quantity and estimated postharvest losses in % per value chain step. Please note that once loss has occurred at harvesting, the percentage loss in the next stage is a percentage of what remained, not of the original amount.
Estimated % of crop left
Estimated % of crop lost
Amount remaining(%)
Estimated postharvest loss(%)
Production
100Remaining: 100% Est. PHL: 0%
0Remaining: 100% Est. PHL: 0%
Harvesting/field drying
89.5379Remaining: 89.5379% Est. PHL: 10.4621%
10.4621Remaining: 89.5379% Est. PHL: 10.4621%
Threshing and Shelling
86.0379Remaining: 86.0379% Est. PHL: 3.5%
3.5Remaining: 86.0379% Est. PHL: 3.5%
Winnowing
83.5379Remaining: 83.5379% Est. PHL: 2.5%
2.5Remaining: 83.5379% Est. PHL: 2.5%
Transport from field
81.0379Remaining: 81.0379% Est. PHL: 2.5%
2.5Remaining: 81.0379% Est. PHL: 2.5%
Household-level storage
80.83387Remaining: 80.83387% Est. PHL: 0.20403%
0.20403Remaining: 80.83387% Est. PHL: 0.20403%
Transport to market
79.83387Remaining: 79.83387% Est. PHL: 1%
1Remaining: 79.83387% Est. PHL: 1%
Market storage
77.18387Remaining: 77.18387% Est. PHL: 2.65%
2.65Remaining: 77.18387% Est. PHL: 2.65%
See full value chain data table with estimated losses in
percentage ›
| tonnes ›